Gi21 Data Centers Infrastructure
An institutional fund for design, construction and operations of next‑generation AI datacenters across Europe. We bridge traditional real estate and high-tech infrastructure — with 20 years of build-operate-exit track record.
















































WHY GI21
We don't just manage capital.
We build and operate.
Proven Pedigree
Our team founded and scaled a significant CEE infrastructure & cloud providers, leading to multiple successful exits.
Full Lifecycle
We manage the entire lifecycle: from land readiness and project design to construction, high-availability operations, strategic partnerships with customers, and exit.
100% Uptime Record
Operating datacenters for over a decade with an impeccable track record of 100% uptime.
In-House Technical Depth
We combine development with proven operations, de-risking assets through live management and SLA-grade reliability.

Zero Chip Risk
Built for the 2028+ compute era
Infrastructure, Not Hardware
We provide the "shovels" for the AI gold rush. Colocation and managed services — zero CAPEX risk from chip obsolescence.
Extreme Density
Up to 250kW per rack. Advanced liquid-cooling compatibility. Structural loading up to 3,500 kg/m².
Universal AI Compatibility
Tier III+ facilities engineered to be generation-agnostic — built to maximize uptime and asset longevity.
Sustainability
Industry-leading efficiency. Baked into engineering, not just reporting.
PUE < 1.15
Significantly better operational efficiency than the market average of 1.45–1.65.
Locations across Europe
Strategic pan-European diversification: maximizing arbitrage through regional energy pricing, superior climatic profiles, and data-accessible locations.
100% Renewable Energy
Long-term Power Purchase Agreements (PPAs) to lock in pricing and guarantee renewable supply.
* PUE – Power Usage Effectiveness

Current Momentum
640–720 MW total pipeline. Already in active execution.

Flagship Site 1
IT Load Capacity
Capacity
100 MW
Construction start
2027
First operations
2029
Flagship Site 2
Nordic
Capacity
100 MW
Construction start
2027
First operations
2029